SlickShifts Building Work

[et_pb_section bb_built=”1″][et_pb_row][et_pb_column type=”4_4″][et_pb_text _builder_version=”3.11.1″]
Hello everyone,
Just a quick post to say that we are still Fully Operational during the massive changes that are going on @ HQ. The front part of the Building is being taken down, never to be seen again! It’s quite an emotional time for us as we’ve been in this same building for over 45 Years! But it just required too much work to be commercially viable for us to keep it going.
The Black Side Door is still the Entrance to the Detailing Store for the time being. But going forward there will be a new entrance to the building which will be down a gated stone pathway. I have tried to use as many parts of the old building as was possible & more of this will be revealed in the near future.
If you have any questions or wish to confirm a visit then please don’t hesitate to contact me either via email or 07540 724686. Cheers Leon

[/et_pb_text][/et_pb_column][/et_pb_row][/et_pb_section]